• Home
  • Latest
  • Fortune 500
  • Finance
  • Tech
  • Leadership
  • Lifestyle
  • Rankings
  • Multimedia

Trendingnow

1

A dropout living in a trailer, he got $1 million from Peter Thiel at 19—now he's a billionaire who says the American Dream isn't dead

2

Current price of oil as of August 18, 2026

3

U.S. strategic reserves are getting so low the drawdown threatens to damage the 60 underground salt caverns storing American oil

1

A dropout living in a trailer, he got $1 million from Peter Thiel at 19—now he's a billionaire who says the American Dream isn't dead

2

Current price of oil as of August 18, 2026

3

U.S. strategic reserves are getting so low the drawdown threatens to damage the 60 underground salt caverns storing American oil
EconomyIRS

Ex-congressman and auctioneer Billy Long once sought to abolish the IRS. Now he’s leading it

By
Fatima Hussein
Fatima Hussein
and
The Associated Press
The Associated Press
Down Arrow Button Icon
By
Fatima Hussein
Fatima Hussein
and
The Associated Press
The Associated Press
Down Arrow Button Icon
June 12, 2025, 2:51 PM ET
Rep. Billy Long
Rep. Billy Long, R-Mo., asks questions during a House Energy and Commerce Subcommittee on Health hearing May 14, 2020, on Capitol Hill in Washington. Greg Nash/Pool via AP File
Add Fortune on Google for similar content.

WASHINGTON (AP) — Former U.S. Rep. Billy Long of Missouri was confirmed on Thursday to lead the Internal Revenue Service, giving the beleaguered agency he once sought to abolish a permanent commissioner after months of acting leaders and massive staffing cuts that have threatened to derail next year’s tax filing season.

Recommended Video

The Senate confirmed Long on a 53-44 vote despite Democrats’ concerns about the Republican’s past work for a firm that pitched a fraud-ridden coronavirus pandemic-era tax break and about campaign contributions he received after President Donald Trump nominated him to serve as IRS commissioner.

While in Congress, where he served from 2011 to 2023, Long sponsored legislation to get rid of the IRS, the agency he is now tasked with leading. A former auctioneer, Long has no background in tax administration

Long will take over an IRS undergoing massive change, including layoffs and voluntary retirements of tens of thousands of workers and accusations that then-Trump adviser Elon Musk’s Department of Government Efficiency mishandled sensitive taxpayer data. Unions and advocacy organizations have sued to block DOGE’s access to the information.

The IRS was one of the highest-profile agencies still without a Senate-confirmed leader. Before Long’s confirmation, the IRS shuffled through four acting leaders, including one who resigned over a deal between the IRS and the Department of Homeland Security to share immigrants’ tax data with Immigration and Customs Enforcement and another whose appointment led to a fight between Musk and Treasury Secretary Scott Bessent.

After leaving Congress to mount an unsuccessful bid for the U.S. Senate, Long worked with a firm that distributed the pandemic-era employee retention tax credit. That tax credit program was eventually shut down after then-IRS Commissioner Daniel Werfel determined that it was fraudulent.

Democrats called for a criminal investigation into Long’s connections to other alleged tax credit loopholes. The lawmakers allege that firms connected to Long duped investors into spending millions of dollars to purchase fake tax credits.

Long appeared before the Senate Finance Committee last month and denied any wrongdoing related to his involvement in the tax credit scheme.

Ahead of the confirmation vote, Democratic Sen. Ron Wyden of Oregon, the ranking member of the Senate Finance Committee, sent a letter to White House chief of staff Susie Wiles blasting the requisite FBI background check conducted on Long as a political appointee as inadequate.

“These issues were not adequately investigated,” Wyden wrote. “In fact, the FBI’s investigation, a process dictated by the White House, seemed designed to avoid substantively addressing any of these concerning public reports. It’s almost as if the FBI is unable to read the newspaper.”

Democratic lawmakers have also written to Long and his associated firms detailing concerns with what they call unusually timed contributions made to Long’s defunct 2022 Senate campaign committee shortly after Trump nominated him.

The IRS faces an uncertain future under Long. Tax experts have voiced concerns that the 2026 filing season could be hampered by the departure of so many tax collection workers. In April, The Associated Press reported that the IRS planned to cut as many as 20,000 staffers — up to 25% of the workforce. An IRS representative on Thursday confirmed the IRS had shed about that many workers but said the cuts amounted to approximately the same number of IRS jobs added under the Biden administration.

The fate of the Direct File program, the free electronic tax return filing system developed during President Joe Biden’s Democratic administration, is also unclear. Republican lawmakers and commercial tax preparation companies had complained it was a waste of taxpayer money because free filing programs already exist, although they are hard to use. Long said during his confirmation hearing that it would be one of the first programs that come up for discussion if he were confirmed.

Long is not the only Trump appointee to support dismantling an agency he was assigned to manage.
Linda McMahon, the current education secretary, has repeatedly said she is trying to put herself out of a job by closing the federal department and transferring its work to the states. Rick Perry, Trump’s energy secretary during his first term, called for abolishing the Energy Department during his bid for the 2012 GOP presidential nomination.

Fortune Daily breaks the traditional barrier between audience and newsroom. The show transforms Fortune’s trusted reporting into actionable, conversational, and entertaining insights for an emerging class of business leaders. Watch here.
About the Authors
By Fatima Hussein
See full bioRight Arrow Button Icon
By The Associated Press
See full bioRight Arrow Button Icon
Add Fortune on Google for similar content.

Latest in Economy

Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025

Most Popular

Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Finance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
By Fortune Editors
October 20, 2025
Fortune Secondary Logo
Rankings
  • 100 Best Companies
  • Fortune 500
  • Global 500
  • Fortune 500 Europe
  • Most Powerful Women
  • World's Most Admired Companies
  • See All Rankings
  • Lists Calendar
Sections
  • Finance
  • Fortune Crypto
  • Features
  • Leadership
  • Health
  • Commentary
  • Success
  • Retail
  • Mpw
  • Tech
  • Lifestyle
  • CEO Initiative
  • Asia
  • Politics
  • Conferences
  • Europe
  • Newsletters
  • Personal Finance
  • Environment
  • Magazine
  • Education
Customer Support
  • Frequently Asked Questions
  • Customer Service Portal
  • Privacy Policy
  • Terms Of Use
  • Single Issues For Purchase
  • International Print
Commercial Services
  • Advertising
  • Fortune Brand Studio
  • Fortune Analytics
  • Fortune Conferences
  • Business Development
  • Group Subscriptions
About Us
  • About Us
  • Press Center
  • Work At Fortune
  • Terms And Conditions
  • Site Map
  • About Us
  • Press Center
  • Work At Fortune
  • Terms And Conditions
  • Site Map
  • Facebook icon
  • Twitter icon
  • LinkedIn icon
  • Instagram icon
  • TikTok icon
  • YouTube icon

    Latest in Economy

    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025

    Most Popular

    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025
    Finance
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
    By Fortune Editors
    October 20, 2025

    © 2026 Fortune Media IP Limited. All Rights Reserved. Use of this site constitutes acceptance of our Terms of Use and Privacy Policy | CA Notice at Collection and Privacy Notice | Do Not Sell/Share My Personal Information
    FORTUNE is a trademark of Fortune Media IP Limited, registered in the U.S. and other countries. FORTUNE may receive compensation for some links to products and services on this website. Offers may be subject to change without notice.